Archive | The Goods Line (Ultimo Pedestrian Network) RSS feed for this section

180 Thomas St- a walk on the Highline

1 Sep

180 Thomas Street is a very nicely designed small office building.
-built diagonally opposite the new UTS Gehry building on the old goods line viaduct (our local version of the NY Highline).
-in a very dynamic part of the city fringe near Central and Chinatown and the university precinct.
-expressive facade with a glass external lift core.
-light filled entry lobby under expressed structural building trusses (supporting new build over existing
substation).

180T-01

Above- Architect’s (Bates Smart) rendering of completed project.

180T-02

Above- current view.

180T-03

Above- Architect’s (Bates Smart) rendering of completed project.

180T-04

Above- current view.

180T-05

Above- Architect’s (Bates Smart) rendering of the light filled entry lobby.

180T-06

Above- current view from street. Note the truss and the proximity to the Sydney High Line.

180T-07

Above- trusses

180T-08

 

Above- the steel trusses being fabricated in Chine.

 

180 Thomas Street Ultimo is a nine storey office building constructed above an existing substation. The project includes retail tenancies at ground level, outdoor eating areas fronting the local pedestrian network, and three levels of fitout including a wintergarden. The building is a steel framed construction with external glass lifts and an extensively glazed façade. The existing structure was originally designed to accept future development and six trusses weighing a total of over 120 tonne have been mounted on struts on the existing roof to support the new works.

Project:180 Thomas St, Sydney
Architect: Bates Smart
Builder- Enstruct

Erection of the steelwork for the 180 Thomas St Haymarket project has commenced. The first steelwork to be erected was the 6 transfer trusses at plantroom level that allow the transition of the office floor plate columns to suit the contemporary office floor plate layout of the new office building and provide the 9.5m cantilever on the western side of the building. Completion of the erection of the Level 1 steelwork will allow the Level 1 concrete floor plate to be placed with the erection of the upper levels of steelwork to follow.

Fabrication for the steelwork at the 180 Thomas St Haymarket project has commenced with erection of steelwork programmed to commence in December. The steelwork for this project is being fabricated in China.

Links

http://www.slattery.com.au/projects/180-thomas-street-sydney/#sthash.YMdodKzN.dpuf

 